The Weekette / Planning / 4-Way Tug Of War Details
4-Way Tug Of War Details
Section Menu
| Submitted by: | Traditional on 12/31/2005 | 
| Held: | Not Yet | 
| Category: | Challenge | 
| Typical Duration: | 60 | 
| Skills Required: | Physical | 
| Difficulty: | Average | 
| Location: | Outdoors | 
| Time Frame: | Unimportant | 
| Work as: | Team | 
| Equipment Needs: | Average | 
| Description | 4 teams pull on an X of rope | 
| Basics | Each tame gets one piece of rope that's tied into an X. They try to pull teams into a center square where they are out. | 
| Why is this something we want to do? | It's tug of war on steroids. | 
| Variations: | None Submitted | 
| Equipment List: | None Submitted | 
| Mitigated Risk: | IIIE (Details) | 
| Reviewed Date: | 2023-12-01 | 
| Reviewer: | sdonohue | 
