The Weekette Logo

The Weekette
The Rush Is On Risk Mitigation Worksheet

Scouting professionals say: "(The Weekette has) ...things down. They are a well-oiled machine."

The Weekette / Planning / The Rush Is On Risk Mitigation Worksheet

The Rush Is On Risk Mitigation Worksheet

Section Menu

Activity Tools
Meal Tools
Theme Tools
Scheduling Tools

Description:Search for resources.
Program:Scouts BSA, Order of the Arrow
Adjusted Hazard:IIIE (Improbable, Marginal)
Mitigation Decision:Acceptable with Review
Prepared:2023-12-01 by sdonohue


Hazard Cause / EffectCorrective Actions
Hazard DescriptionCauseEffectInitial Risk RatingPossible Controlling MeasureClosing CommentsStatusFinal Risk
Hypothermia / FrostbiteExposure to cold temperatures over a prolonged period.Camper develops a condition which requires first aid or medical attention.IIICEnsure proper preparedness of participants prior to activity. Those who are unprepared must remain in cabin.IIIE
Hypothermia / FrostbiteExposure to cold temperatures over a prolonged period.Camper develops a condition which requires first aid or medical attention.IIICMonitor weather conditions and if they are not conducive to outdoor activities, change the location, reduce the duration of the even, or change to a different event which is better suited to the weather.IIIE

Historical Context: This event was first held at Winter Camp XXXVII (in 2013). It was been held a total of 1 times without an incident.

Based on Location: O Timing: D Category: Activity

Return to the The Rush Is On details.


There is additional functionality on this page if you are logged into the site.