The Weekette / Planning / Rocket Building Risk Mitigation Worksheet
Rocket Building Risk Mitigation Worksheet
Section Menu
| Description: | Build both model and water rockets |
| Program: | Scouts BSA, Order of the Arrow |
| Adjusted Hazard: | IIIE (Improbable, Marginal) |
| Mitigation Decision: | Acceptable with Review |
| Prepared: | 2023-12-01 by sdonohue |
| Hazard Cause / Effect | Corrective Actions | ||||||
| Hazard Description | Cause | Effect | Initial Risk Rating | Possible Controlling Measure | Closing Comments | Status | Final Risk |
|---|---|---|---|---|---|---|---|
| Bodily Injury | Use of tools may cause injury | Tools slips, is misused, or an accident occurs. | IVC | Follow SAFE tool guidelines for age appropriate tools and guidelines | IVD |
Historical Context: This event was first held at Winter Camp XLIII (in 2019). It was been held a total of 1 times without an incident.
Based on Location: Timing: Category: Challenge
Return to the Rocket Building details.
There is additional functionality on this page if you are logged into the site.
