The Weekette / Planning / CHR Memorial Construction Risk Mitigation Worksheet
CHR Memorial Construction Risk Mitigation Worksheet
Section Menu
| Description: | Build and maintain a site to honor the gone but not forgotten Charles Howell Scout Reservation. |
| Program: | Scouts BSA, Order of the Arrow |
| Adjusted Hazard: | IIIE (Improbable, Marginal) |
| Mitigation Decision: | Acceptable with Review |
| Prepared: | 2023-12-01 by sdonohue |
| Hazard Cause / Effect | Corrective Actions | ||||||
| Hazard Description | Cause | Effect | Initial Risk Rating | Possible Controlling Measure | Closing Comments | Status | Final Risk |
|---|---|---|---|---|---|---|---|
| Hypothermia / Frostbite | Exposure to cold temperatures over a prolonged period. | Camper develops a condition which requires first aid or medical attention. | IIIC | Ensure proper preparedness of participants prior to activity. Those who are unprepared must remain in cabin. | IIIE | ||
| Hypothermia / Frostbite | Exposure to cold temperatures over a prolonged period. | Camper develops a condition which requires first aid or medical attention. | IIIC | Monitor weather conditions and if they are not conducive to outdoor activities, change the location, reduce the duration of the even, or change to a different event which is better suited to the weather. | IIIE | ||
| Injury to Hands or Fingers | Use of small hand tools like knives and saws | Knife or tool slips. | IVC | Adults and leaders monitor proper use of tools and provide guidance where required | IVD | ||
| Injury to Hands or Fingers | Use of small hand tools like knives and saws | Knife or tool slips. | IVC | Ensure users have Totin' Chip training | IVD |
Historical Context: This event was first held at Winter Camp XI (in 1987). It was been held a total of 1 times without an incident.
Based on Location: O Timing: D Category: Creative
Return to the CHR Memorial Construction details.
There is additional functionality on this page if you are logged into the site.
